On-going Projects

Kabeli-A Hydroelectric Project (37.6MW)

Kabeli-A Hydroelectric Project (37.6MW)

Kabeli-A Hydroelectric Project (KAHEP) is located in Panchthar and Taplejung districts of Province 1. The project is Peaking Run-Of-River (PROR) type project with a peaking reservoir constructed by damming Kabeli River at headworks. The water from the reservoir will be diverted through a 4.5 km long tunnel into a Powerhouse located on the left bank of Tamor River generating 37.6 MW.

Super Machha Khola Hydroelectric Project (4.6MW)

Super Machha Khola Hydroelectric Project (4.6MW)

is a 4.6 MW run-of-river hydropower project located in Dharche Rural Municipality, Gorkha District, Nepal. Developed by Budhigandaki Hydropower Pvt. Ltd., the project aims to generate clean and reliable energy by utilizing the natural flow of the Machha Khola River

Bhotekoshi-1 Hydropower Project (44MW)

Bhotekoshi-1 Hydropower Project (44MW)

The Bhotekoshi Hydropower Project, located in Sindhupalchowk District’s Bhotekoshi Rural Municipality, represents a significant step forward in Nepal’s renewable energy landscape. Designed as a run-of-the-river system.

Lower Thulo Khola Hydropower Project (6.51 MW)

Lower Thulo Khola Hydropower Project (6.51 MW)

Malta Bagmati Hydropower Project (6.50MW)

Malta Bagmati Hydropower Project (6.50MW)